725 Potter
Core and shell construction of a new, 140,000 SF laboratory building parking garage. Three stories over a basement, the building is concrete construction except for a top floor framed in steel. Because the job site was in close proximity to neighboring lab buildings on the campus, Âé¶¹AV worked closely with the owner to ensure that the work did not inconvenience neighboring labs or cause any safety issues.